Douglas County, Washington, USA
Douglas County approved the purchase of a second 5MW electrolyzer to advance hydrogen equipment. The infrastructure currently being built in Baker Flats has the capacity to accommodate up to 80MW of hydrogen production.
Project Type |
Hydrogen Production and Fueling Facility |
Location |
Baker Flats |
Industry Served |
Utility and Electric Systems |
Area Served |
Douglas County, Washington |
Use Applications |
Production of hydrogen for power systems |
Equipment |
Additional 5MW electrolyzer |
Production Capacity |
80MW |
Ownership Terms |
Douglas County P.U.D. |
Status |
In Construction |